Customization: | Available |
---|---|
Folded: | Unfolded |
Power Source: | Manual |
Still deciding? Get samples of US$ 800/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product description
RLD-4007 crawler self-generating electric treadmill is a new concept green treadmill developed by our company independently, which adopts an elastic rubber arc running deck, crawler runningbelt lamination technology. Using gravity to start, accelerate and decelerate and controlling the speed freely, the product overcomes the impact to the knee due to the failure of footsteps to keep up with therunning belt in passive running, radically puts an end to the traditional electric "passive" runningway and realizes "active" running in the real sense. The arc running surface, crawler elasticrubberrunning belt and active running design reduce the impact during movement and effectivelyprotect the runner's knees, while the bearing drive system reduces movement wear and lowers the maintenance costs.
Contact way
Nina Yang
Thanks for your attention! Welcome your inquiry!
Payment and service
1) Payment term:
30% T/T in advance,the balance before the shipment.
2) Place of delivery:
Tianjin or Qingdao, China
3) Warranty term:
Item Warranty Period
|
|
Strength Equipment
|
|
Frame
|
10 yeras
|
Cams
|
3 years
|
GUide Rod
|
3 years
|
Weight Stack
|
3 years
|
Rotary Bearing
|
2 years
|
Pulley
|
2 years
|
Others
|
1 years
|
Cadio Equipment
|
|
Frame
|
10years
|
AC Motor
|
3years
|
Inventer
|
2years
|
Display PCB
|
2years
|
Incline Motor
|
2years
|
Others
|
1year
|
FAQ
1. Q : What's the payment term?
A : 1). 30% deposit upon confirmation of order, balance before delivery.
2. Q : How can I get sample and how long will it takes?
A: Sample fee will be doubled, but we will refund the extra money after you place an order to us. It usually takes20-25 days to produce a sample.
3. Q : What's the delivery time?
A: It will take about 15-25 days to finish an order. But the exact time is according to actual situation.
4. Q : Can I have my own customized product?
A : Yes, your customized requirements for color, logo, design, package, carton mark, etc. are very welcomed.
5. Q : Do you have quality control?
A: Yes, we attach great importance to quality control.
6. Q : How about the warranty?
A : Two years warranty for frames since sold. If quality problem occurs , please feel free to contact us.